Metro Rail in Bangladesh : A Milestone in Communication
The metro rail system in Bangladesh is the second-largest project under
the present government. It has been a long-held ambition of Dhaka city
residents, who have seen the city's traffic situation deteriorate day
after day.
Metro rail in Bangladesh Paragraph
It is
anticipated that the metro rail system will be primarily operational by
the end of 2021, at the latest. Initially, a ten-kilometre section between
Agargaon and Uttara would be made available. The project will have a total
length of 20 kilometres, and the line will extend as far as Motijheel. It
is estimated that the metro rail system would transport 60,000 people per
hour at its peak capacity. It will feature stations at 16 different
locations across the city.
Benefits of Metro Rail
Residents of Dhaka city have to bear the brunt of traffic jams every day
but they will not have to endure that bustle for a long time. In a few
days they are on the way to fulfilling their dreams.In 2022, the residents
of Dhaka city will be able to reach their desired destination by Metrorail
in a short time without any strain.
Metro Rail will provide multi-faceted benefits to the residents of
Dhaka.They are- 1.
- This will free the residents of Dhaka city from the traffic jam
- It will saveyi the precious time of the residents of Dhaka city 3.
- The journey will be very comfortable and safe
- Passengers will feel very comfortable as the train is air-conditioned
- City dwellers will be able to reach their destination in a short time and at low rent.
- Passengers do not have to wait long at the station for the train .
- There will be no opportunity to travel by train without fare which will ensure transparency.
- Each coach of the Metrorail will be well-equipped, comfortable and cozy.
- Passengers will be able to travel very comfortably on the Metrorail even while standing.
- Each Metro Rail station will be sophisticated and spacious where there is no possibility of gathering.
benefits of metro rail in Bangladesh
Metro Rail in Bangladesh
Dhaka city has a lot of vehicles and the smoke from those vehicles
pollutes the air intensely but since the metro rail will be electrically
powered, it will be possible to maintain this communication system in a
good way by protecting the environment. One of the major advantages of
this metro train is that if there is a power outage, it will not be
disrupted but will run smoothly.
about metro rail in bangladesh
This metro train will be equipped with all kinds of modern facilities so
that passengers can complete their journey with ease and comfort. This
metro train will have wide doors for passengers to get on and off safely.
Although various measures have been taken at different times to ease
traffic congestion in Dhaka city, they have not been very effective but
this metro rail will definitely play an effective role in reducing traffic
congestion.
Metrorail will not only alleviate traffic congestion in Dhaka city but it
will greatly enhance the beauty of Dhaka city and at the same time play an
important role in the economic development of the country. After the
Metrorail project is completed, the residents of Taka city will be able to
a different, unique and beautiful Dhaka city.
This year we are celebrating the golden jubilee of independence with
great pride and at the same time the work of two big project Padma Bridge
and metro rail is nearing completion. At this great moment of celebrating
the centenary of Mujib and the golden jubilee of independence, the nation
is on the way to fulfilling two more big dreams.
By 2022, the Padma Bridge will be open to traffic and at the same time,
the Metro Railway will enable the residents of Dhaka to travel with ease.
In August this year, the residents of Dhaka city will be able to see the
experimental movement of Metro train on the flyover.
Three-quarters of the construction work of the Dhaka metro rail route has
already been completed. Two sets of trains have already been brought to
the country from Japan. It is learned that three more sets of trains will
be brought from Japan by September this year and the rest of the 19 sets
trains will be brought in phases.In the first phase, the train will run
from Uttara to Pallabi and then to Agargaon.
metro rail in bangladesh composition
About 90% of the construction work including flyover from Uttara to
Agargaon has already progressed. In addition, the progress of work from
Agargaon to Motijheel has been about 65 percent. The length of Metro Rail
from Uttara to Motijheel is 20.10 km and it has 16 stations. Line 6 of
Metrorail has two sections from Uttara to Agargaon and from Agargaon to
Motijheel.
Metrorail's work is moving forward after overcoming many obstacles and
challenges and little by little a project like Metrorail is being
completed and our dream is coming true. The progress of Metrorail work has
slowed down after the terrorist attack on the Holy Artisan but it is
moving very fast under the strong leadership of the present government.
The work of Metrorail is being carried out very efficiently even in the
midst of the Karna epidemic and the work of Metrorail has not stopped even
for a moment, despite thousands of challenges.
The foreign experts and staff involved in this mega project have not been
able to get their work done in time due to the epidemic, but they have not
stopped at all. The 668 people involved in the construction of the
Metrorail were infected with the corona virus, but its journey has not
stopped and continues.
For metro rail, different types of goods have to be brought from abroad
and in this case the concerned people have had to face many stresses and
challenges due to the corona epidemic. The government is implementing the
Metrorail project at a cost of about Tk. 22,000 crore, and Japan
International Cooperation Agency (JICA) has funded in this project and the
progress of the entire project has been 65 percent till May.The population
of Dhaka is constantly increasing and at the same time the perimeter of
Dhaka is also increasing and therefore the development of communication
system became essential in Dhaka city.
metro rail in bangladesh
Thousands of working hours are wasted every day in Dhaka city due to
traffic jams and a lot of resources are wasted and a big project like
Metrorail was needed to get rid of it. How developed a country is can be
easily gauged by looking at the communication system of that country and
this Metro Rail is a great example of our economic development. This metro
rail will not only ensure a good communication system for the people of
Dhaka but will also create a lot of jobs and the country will be far ahead
financially.
A country's improved transport system changes the face of that
country. A country cannot move forward easily without improved transport
system. Developing an integrated transport system is essential for the
socio-economic development of a country and improved communication is
ineluctable for balanced economic development. The last decade has seen a
revolution in the transport system of Bangladesh.
This has been possible due to the goodwill of the government, the love of
the people of the country and the good relations with the international
world. The biggest milestone of Bangladesh's communication is the Padma
Bridge. Bangladesh is going to be one of the countries in the world with
improved communication system. One cannot but be amazed at the future road
plan or travel lines of Bangladesh.
Therefore, individuals will have an easier time transitioning from one
place to another. As a bonus, it will lower the number of car accidents on
the road. People's reliance on private automobiles will decrease,
resulting in an improvement in traffic conditions. The metro rail system
is also environmentally beneficial since it is electric, so there will be
no honking. It uses less energy than the traditional road-based traffic
system. It is anticipated that the entire journey will not take more than
40 minutes to complete at the current pace. As a result, individuals will
have an easier time moving from one location to another. The introduction
of metro rail will have several good consequences for our social and
economic lives.
0 Comments